Construction Technology | Construction Scheduling (2 cr.)
340 | --


Class 2. P: CNT 280 or consent of instructor. A study of the planning and
control of construction projects. Topics include time schedules, labor, and
equipment balancing; expediting material delivery; bar charts and critical
path method (CPM) network scheduling; and an introduction to the use of the
computer in CPM network analysis.