Class 2. P: CNT 280 or consent of instructor. A study of the planning and control of construction projects. Topics include time schedules, labor, and equipment balancing; expediting material delivery; bar charts and critical path method (CPM) network scheduling; and an introduction to the use of the computer in CPM network analysis.