Class 2, Lab 3. P: CNT 280 or consent of instructor. Course includes a study of the methods of estimating costs for labor, material, equipment, and direct overhead for construction projects; how to establish markups for indirect overhead and profit; procedures for setting up a computerized estimating system; and conceptual estimating procedures.