Class 3. P: CNT 330 and CNT 340 or consent of instructor. The study of bidding practices for lump-sum and unit-price contracts used in the construction industry and in estimating total job costs. Topics include unit costs of materials and labor, overhead, subcontracts, total estimated costs, and bid price. Introduction to use of computers in estimating. The development of a total bid for a project is required.