|
Spring 2001 Field Trip
Previous Page | Next Page
Students listen attentively to an explanation of Mr. Johnson (outside the picture) about monitoring well construction.
In the foreground is a 5-foot long stainless-steel well screen to be installed in the bore hole.
|