• Home
    • What is LENS?
    • Neutron Science
      • Importance of Neutron Science
      • Neutron Science Research Areas
      • Neutron Science Links
    • Recent News
    • Conferences and Workshops
    • View LENS Webcam
    • Construction History
    • Photo Gallery
  • DUT
    • SANS
      • Instrument Description
      • Instrument Characteristics
      • SANS Sample Environment
      • SANS Science Applications
    • SESAME
    • Future Beamlines
  • Beam Properties
    • Research at LENS
    • Faculty Research Areas
    • Publications
  • Dosimetry
  • Device Test
    • Main Directory
    • Current Graduate Students
    • Current Postdoctoral Researchers
  • Directory
    • Undergraduate Students
      • Neutron Scattering Courses
      • Applied Physics Program
      • REU Program
      • Internships
    • Graduate Students
    • Postdoctoral Opportunities
    • Public Opportunities
      • ISTEME for k-12 students
      • Mini University
      • Outreach
  • User Information
    • Applying for Beamtime
    • Visiting Us
      • Access to LENS
      • LENS Tour
      • Visiting Bloomington
    • Travel and Lodging Information
    • Bloomington Information
  • Internal
    • LENS Operations Schedule
    • LENS Software Wiki
      • Experimental Control
      • Data Reduction
      • Data Analysis and Visualization
    • Lab Safety
    • Login Portal
  • Contact Us
  • News and Events

    • NREF Beam Schedule
    • Recent News
    • Conferences and Workshops
  • Other Information

    • Apply for Beamtime
    • Beam Pricing
    • Visitor Information
    • Bloomington Information
    • Center for Exploration of
      Energy and Matter (CEEM)
    • LENS at CEEM
    • NREF Facebook Page
    • site search by freefind

Pricing Policy


Effective July 1, 2011

Scheduling beam time in Neutron Radiation Effects Facility for Neutron Radiation Effects Testing is per minimum 12 hour day.

Beam time is charged at the rate of $363.56 per hour with a 12 hour minimum ($4,362.72).

Cancelation up to two weeks prior to the run is without penalty.  After that, the fee for 12h per day applies.  Likewise, any scheduled day that is not used during a visit is charged 12h per day.

If NREF cannot deliver beam due to technical problems, only the delivered number of hours will be charged for a given day.

Setup outside of the irradiation vault is at no cost.  Charges apply as long as the room is occupied when beam is available.

For Purchase Orders please contact:
Gail Morell
Finance Assistant
Indiana University
Center for Exploration of Energy and Matter
2401 Milo B. Sampson Lane
Bloomington, IN 47408-1398

PH:  812-855-6374  Fax:  812-855-6645
gmorell*

*Note: In an effort to reduce spamming, IU email addresses have been listed below without domain information. Addresses can be reconstructed by adding @indiana.edu after a specific email username.

 

 

Check out the ALPHA facebook page! NREF facebook page  •    ©  Copyright 2012  •  The Trustees of Indiana University  •  Copyright Complaints  •  Privacy Notice  •  Design by NREF  •  Template by CSS Templates

  Contact Webmaster