The Indiana University Design Standards were prepared to assist design consultants to understand and meet University expectations. These standards also assist in the preparation of
consulting fees and project specifications that meet University requirements from the outset. Please review this site often for updates to the Standards.
Electrical Design Standards (revised 5/2006)
IU Telecomm Contractor List (8/20/2008)
To view and print the IU Contracts or Standards, you will need to have the Adobe Acrobat .pdf viewer loaded as a plug-in to your browser. If you don't have this loaded, please click on the Adobe button to get a free, downloaded .pdf viewer.
In order to save a PDF file to your local computer - move your mouse over the link and right-click your mouse and do a "save link" to your local computer or once the PDF file is opened, go to the file pulldown menu on your browser toolbar and do a "save-as" to your local computer.
Indiana University Contracts with Consultants
Mechanical Design Standards (revised 2/8/2008, Airborne Contaminants Control - 15061)
Site / Landscape Standards (revised 10/26/2006)
Telecomm Standards - IUB and IUPUI (updated 04/04/2008)
CAD As-Built Requirements (revised 10/26/2006) now require one set of pdf files for every CAD as-built sheet & AutoCAD 2000-2006 dwg format - but no AutoCAD 2007 dwg format at this time
Engineering Consultant Design Deliverables (4/2006)
6/1/2007 – for any new A/E contracts initiated as of 6/1/2007, the contract area under Reimbursable Expenses has been changed to now eliminate any printing cost items. All printing for project needs will now be done through IU's Centralized Printing Vendor (Eastern Engineering) with all printing costs billed directly to Indiana University. Also changed in the A/E contracts is the professional photography section that now eliminates the 35mm color slides and further refines the digital photography format.
For those contracts initiated between 2/19/2007 and 5/31/2007 – the contract area under Reimbursable Expenses entitled “Printing Costs for Drawings and Specifications” has been changed. There no longer is a requirement for the first 10 or 25 sets (pending project cost) of the bid document printing costs to be paid by the A/E consultants. All bid document printing is now to be coordinated and produced by Indiana University’s Centralized Printing Vendor and distributed for bidding online at http://www.iuplanroom.com. All other project drawings and specification printing expenses still need prior Owner approval before reimbursables may be submitted.
IU Agreement between Owner and Architect for Projects over $500,000. (revised 7/1/2008)
IU Agreement between Owner and Architect for Small Projects. (revised 7/1/2008)
IU Agreement between Owner and Engineer for Projects over $500,000 (revised 7/1/2008)
IU Agreement between Owner and Engineer for Small Projects. (revised 7/1/2008)
IU Agreement between Owner and Consultant for Small Projects. (revised 7/1/2008)
IU Agreement between Owner and Architect for Roofing Projects. (revised 7/1/2008)
IU Agreement between Owner and Commissioning Consultant. (revised 7/1/2008)
IU Agreement between Owner and Asbestos Consultant. (revised 7/1/2008)
IU Agreement between Owner and Consultant for Non-Construction Projects. (new 7/1/2008)
Addendum to Contract form (MS Word.doc format - new as of 9/11/01)
(revised as of 5/22/2006)
web site address: http://www.indiana.edu/~uao
Copyright 1999-2008, The Trustees of Indiana University.
Last Updated: 8/20/2008
Comments: webmaster
|
Contracts/Standards |